Why is achieving Gold status for Constructionline membership?

Why Gold Constructionline Membership Matters to us and our clients
By Graham Feasey, Quality Assurance Manager, Advanced Metalcraft Ltd

Achieving Gold Constructionline membership was a deliberate step forward for Advanced Metalcraft Ltd. not just for our internal development, but because of the clear value it brings to our clients.

Strengthening our credibility, Gold status broadens our access to tender opportunities, and demonstrates our ongoing commitment to excellence and compliance. But just as importantly, it offers reassurance to our clients that they’re working with a trusted, reliable contractor.

Here’s why that matters:

Lastly, achieving Gold means we meet the demanding standards of the Building Safety Act 2022  and as such as assurance that we’re legally compliant and ready to take on both public and private sector projects with professionalism and integrity.

In short, our Gold Constructionline membership doesn’t just benefit us, it provides those who we work with the peace of mind that they’re partnering with a capable, compliant, and dependable contractor.

🎉 We’ve gone Gold! 🏅

In line with BSR (British Safety Regulator) we're proud to share that Advanced Metalcraft Ltd is now officially a Gold Constructionline Member.

Covering rigorous procedures in fire safety, this fantastic achievement and new Gold status reflects the high standards we set for ourselves and deliver for our clients every day.

In real terms, what it means is

Getting here wasn’t just about ticking boxes, it meant putting our business under the spotlight and refining how we work making our business stronger, more efficient and ready for even bigger opportunities ahead.

A huge well done to Graham Feasey and everyone involved in making this happen 👏

August 2025 Project Update

Catching up with the all but completed Gallion’s View development in Woolwich, delivered by Fairview New Homes; a striking residential scheme comprising of Blocks A, B, C, D and houses ranging from 4 to 11 storeys high.

This mixed traditional and concrete frame project showcases the scale and versatility of our work, and we were thrilled to contribute to bring such an impressive development to life.

Our scope included:

Completed by late spring 2025, this is a true showcase of our team's collaboration, scale and technical delivery; a great reminder of the importance of reflecting on what we're capable of achieving together. Projects like this help us push boundaries, refine our processes and continue raising the bar.

June 2025 Project Update

A couple of months ago the curved balconies we manufactured, supplied and installed for BERKELEY HOMES (CAPITAL) PLC over at their Kidbrooke, Phase 5, Block E development were already looking fantastic 😍

Through our expertise and commitment to safety and performance, we seamlessly blended the softness of the curved design with the strength of our engineering. The result is a standout structure that makes a bold yet refined statement.

Our scope included:


If on a cloudy day they can look this stunning, imagine how they look and feel to be out on one today ☀️ 

Cambridge Dragon Boat Race 2023

Exciting news!! Advanced Metalcraft Ltd are taking part in the 2023 Cambridge Dragon Boat Race on Saturday September 9th. It's the first time we'll be taking to the water as a team and we are in it to win it! ????

The Dragon Boat Festival is in aid of Addenbrooke's Charitable Trust which is a very important cause for our company. We have set up a Just Giving Page and everything we raise on there will be donated to Addenbrooke's Charitable Trust.

Use this link https://lnkd.in/eVvNgSXJ to head over to our page, read our story and help us reach our goal.

Thank you

FORS bronze accreditation maintained for another 2 years

We were audited to maintain our FORS Bronze accreditation on June 18th and we're pleased to announce we were our audit summary back June 28th with a 100% pass.

This was our third FORS Bronze audit, which are carried out every 2 years, with our FORS Silver audit being conducted every year. 

Contractors Health & Safety Monthly Scores Winner!

Berkeley Group have awarded Advanced Metalcraft as the winner of the Contractors Health and Safety Monthly Scores for KV2 & KV5 in September and KV5 in October. 

FORS Silver accreditation maintained for 2024

We have received confirmation from FORS our Silver audit submitted recently has met the required criteria for FORS Silver, giving us a 100% pass rate since joining the scheme.

Movember 2023 for G.O.S.H

Advanced Metalcraft are taking part in Movember this year to help fundraise for Great Ormond Street Hospital Children's Charity.

This is a cause which holds special significance to our company and employees. 

Check out our JustGiving page and please donate if you can. https://bit.ly/461d1ye

Don't forgot to have a look through our progress pictures in the updates!

FORS Silver accreditation maintained

In November 2022 we submitted our third FORS Silver audit and have received our re-approval certificate having passed with 0 minors